On Track Pre-Kinder consisted of commissioning a 11,117 SF pre-kindergarten school for the Gadsden Independent School District No. 19. This involved concrete footings, structural steel interior, steel bar joists and B-deck roof structure, a combined standing seam metal roof system and a thermoplastic polyolefin membrane roof system. Exterior finishes included standard sidewalks, curbs and gutters, paving, irrigation and landscaping, playground equipment, rod iron fencing, steel canopies, and a retention pond.