Fire station #1 consisted of a 1,346 SF remodel and a 2,290 SF addition to the existing building with structural, architectural, mechanical, plumbing, and electrical assemblies. Architectural spaces included an equipment room, offices, a training area, sleeping quarters, physical fitness area, mechanical room, and I.T. room. The building also included steel construction with a thermoplastic polyolefin roofing system and a plymovent exhaust system in the bay area.