Corbett Center Exterior improvements included removal and replacement of stucco for the entire building as well as entire concrete at the Amphitheater stairs. There was additional removal and replacement of concrete sidewalk on the east side of the building, painting of north side metal trellis, refinishing of exterior laminated wood beam, and roof replacement for storage room at the loading dock.